Showing posts with label Connect '09. Show all posts
Showing posts with label Connect '09. Show all posts

Wednesday, September 9, 2009

Something from Nothing

I've (finally) looked through the TDP and there's enough information out there on the net and in print as far as analysis of the TDP goes, so I figured I would take a little bit of a different view. I decided to pick the best of the best; the route change which, in my opinion was the best "new" look created as part of the TDP.

This year's Something out of Nothing award goes to: The G2 West Busway/Downtown/Oakland (Formerly known as the 100) (check out page 203 of the document). The Port Authority took a route that had some value, gave it additional responsibilities/routing and the route ultimately came out a much improved product.

Why do I like this so much, you ask? Simple, it creates a route that increases interconnectivity, maximizes grade separation that will increase not only its own efficiency but efficiency on additional routes. As any of you who read this blog with any regularity will know, I love interconnection, separated grades, and efficiency.

The new routing starts in Robinson Town Center, and travels the Parkway to the West Busway, through downtown to the East Busway to Oakland. It returns by the same route. The old route started in Carnegie, traveled on the West Busway, and made a big loop in the East End, meaning it went via the East Busway to Oakland and returned downtown via 5th Ave and Boulevard of the Allies.

First of all the routing is much improved. By routing the G2 on the East Busway in both directions, the transit time between the two will be quicker, and will have fewer stops. This will make it a more attractive option for students trying to get downtown or to Robinson. To me this is an incredibly simple change that will pay dividends.

Secondly, by extending the route to Robinson, the G2 will take on the 28X's responsibility of stopping in Robinson Town Center (the bane of any rider's trip to the Airport in the past). This could potentially increase ridership on the G2 in addition to the fact that the 28X(R28) will now be able to shave a significant amount of time off its schedule making its service more appealing. A good scenario for both routes.

In some of the more sensationalized, attention grabbing headlines I have seen concerning the TDP; they have advertised it simply as the latest in a series of "route cuts". Not so my friend, and the new G2 is the perfect example proving that the program is not just another in a long series of "route cuts".



Note: The Port Authority needs to clean up the maps vs. route descriptions on the TDP website. If I look solely at the map, it seems that the new G2 will operate between 6 AM and 12 PM, and will use the existing route structure once across the river (between downtown and Oakland). If I read the draft recommendations document, it states that the bus will operate from roughly 6 AM to 12 AM and will use only the East Busway in both directions from downtown to Oakland.

Saturday, September 5, 2009

Rapid Buses, Noise, and Customer Service

TDP and the BRT

I haven't been focusing as much on the TDP perhaps as I should be, but as usual, Paz over at Politics and Place gives some good analysis on some fluff on the TDP concerning rapid buses. For my two cents, if Pittsburgh wants to emulate anything they should emulate L.A. which has developed a comprehensive "rapid" bus system and has taken BRT further than any other transit agency in the nation with its Orange Line and Rapid services. When it comes to levels of bus service, L.A. is a standard we should work towards.

Quiet Buses

This may be one of the most exciting topics I have ever written about in the short history of this blog. That's right folks, bus mufflers. Even if you're not transit-geek enough to notice by looking, if you ride the bus, you've probably noticed the noise improvement because of the distinct lack of that loud obnoxious Port Authority bus sound and the frequent plume of black smoke.

I love these things for several reasons:

1. Makes buses quieter

2. Gives buses, and transit in general better PR

3. Potential emission improvements

I'm not sure if these new mufflers are actually filters as well, or if they are just mufflers. I searched the web and Port Authority's website but couldn't really find out much information that would point to whether these new exhausts were filters or not. I attempted to contact the Port Authority but (surprise, surprise) have not received a response.

If indeed these new exhausts are filters, my first question, is why the hell aren't they on all the buses. This ties in well with my post about the emission reduction grants. Spare the hybrid buses for now, and improve your whole fleet using the federal money. I do not know the price of these exhausts, but think of the number old stinky buses that you could fit for the price of one hybrid bus. I don't have the facts to really do a comparison analysis, but the question is; is anyone at the Port Authority doing the analysis? Has anyone asked the question whether it would create a greater benefit in emission reduction to outfit all the buses with this new filter or get a few hybrid buses? From my experiences with the Port Authority, my guess is probably not.

Customer Service, or Lack Thereof

I don't have that much experience with other transit agencies, but good god is the Port Authority not-user friendly. From rude drivers, to tying to get information of any kind (other than schedules), I have had so many headaches it's ridiculous. When I do a post about the Port Authority that requires technical information from the Port Authority, I pray that I can find it elsewhere, because trying to get it either from calling them or through their online comments section is like pulling teeth. What are your experiences? I have a hard time believing I am alone in this experience.





Friday, August 28, 2009

Are you happy? I'm happy

The big day is here and the results have been released (at least to the Press, oddly enough they're not yet available on the TDP website) It seems as though option two has won out, and that is a good thing.

It's good for alot of reasons, not the least of which is that the fact it was long overdue. Pittsburgh's population distribution and development patterns have changed dramatically over the last 50+ years, and the Port Authority never adapted their service to the changes. This was much needed. Better service will be provided to the now high density areas, and areas that do not have the same transit usage as in past years will see corresponding cuts in service.

Additionally, this should show, to the people who like to use the arguments that mass transit isn't efficient, or that mass transit agencies don't operate efficiently, that the Port Authority is making a good faith effort to both decrease operating costs while increasing service. Talk to any businessperson out there, that's good business thinking.

Finally, this is excellent timing. With transit funding stagnant in Pennsylvania, any way the Port Authority can save money is a good thing.


Public comment will be held from today through September 30th. TELL THEM YOU LIKE IT!

Wednesday, December 3, 2008

The contract

I figured, unlike the last big news where I didn't blog about the contract resolution between the Port Authority and ATU 85 until about 5 days after it happened, I should address the latest news more promptly.

The details of the contract have been released. I won't regurgitate the details about it but you can find the full report and article here. For the most part, the new contract doesn't deviate too far from the fact finder's report that was published in August. The pay raise doesn't bother me that much, it's more of a cost of living adjustment. The only issue is the fact that the Port Authority will have to foot the bill for some who retire early, and will have to continue to pay health benefits for those same individuals.

I guess you can't get everything, and I think these compromises have helped slow the bleeding, but will not, I believe, be able to stop it. I am concerned that we will run into a similar situation to what we just endured in Pittsburgh when the next contract rolls around. I think the Port Authority will realize (or someone will make them realize) that further cuts must be made, and ATU 85 will resist next time just like they did this time. Only, next time the economy may be in a different place and the union could be much more empowered than they were in this case. Time will tell.

These are, if nothing else steps in the right direction. The new contract, combined with route restructuring and other reforms being thrown around the Port Authority could lead to increased ridership and less $$$ wasted.