Wednesday, January 19, 2011

“T” Gate

*Disclaimer*  I usually try and be pretty fair, using facts to support my arguments.  This is strictly my opinion.  If at any point you become offended, stop reading and close your browser window.  I’ll be back to the regular old stuff soon enough. 

Enough of this crap. 

It’s getting really ridiculous to see ATU 85 once again shoot the Port Authority, and in turn, themselves in the foot to prove a point.  What that point is, I’m not exactly sure. 

I do know what is being said, however.  The ATU 85 is saying that the Port Authority’s “T” schedules are impossible to follow without violating speed restrictions.  All of this supposedly came about after an external safety audit of PAT operations.

The Port Authority is coming back and saying that the speed limits have not changed in over 12 years. 

I can’t unequivocally say I know that this is the Union’s fault and not PAT’s.  However, judging from the contract “negotiations” of 2008 where the Union threatened to strike because of a minimal increase in healthcare costs, and a lot of the stupidity I have heard roll out of Pat McMahon’s mouth over the past few years, I’m siding with the Port Authority. 

Again, I’m not sure what the real point of ATU 85’s shenanigans are.  If their point is that the 15% service cuts are bad, then address that, pissing off commuters on the T is in no way that my feeble brain can comprehend productive.  All they are doing is adding a disgruntled third party.  A third party that can either support the Port Authority, and in turn ATU 85 or harm the Port Authority and in turn ATU 85. 

In fact, the biggest thing the Union can do to screw itself is to give the taxpayers the impression that they are overpaid and that they underperform.  Right now, it seems like they are right on track to screw themselves.  In the face of extreme budget uncertainty and while they are some of the highest paid transit operators in the Nation, the ATU 85 has decided to go toe to toe with the Port Authority by delaying trains…BRILLIANT!

As I said, I have no idea what this is really about, but I do know what this is accomplishing.  It’s further eroding the faith in public transportation and the Port Authority, by no fault of its own; and could ultimately lead to even GREATER layoffs and service cuts in the future.  

Wednesday, January 5, 2011

Mid-week Train Links

Here’s a couple of links I found today, both rail related.

First, in the total surprise department, the Trib issued a transportation (other than auto)  friendly column yesterday. 

Check it out here

Before you get too excited, links at the bottom of the page are a little less Bizzaro-Trib in nature.  After reading this article you can find out how “liberals” have been proven to be “stupid”. 

Enough attempted humor.  The article is dead on, and fits in well with what experts in transportation and infrastructure have been screaming into deaf ears.  Our transportation system is second rate and getting worse, because as we aren’t spending money to fix it and integrate it.  In this country, if it’s not about cars it’s a conspiracy against our Freedom, or some such nonsense.  While we are busy doing this:

See no evil

the rest of the world is improving its infrastructure, in this case its rail systems. 


Second, This link comes from the Post Gazette.   Apparently the midst of a budget/funding crisis where the fare from every rider counts is the perfect time to practice Union tomfoolery. 

I am a pretty progressive person (especially when it comes to transportation, which should be no suprise) but there’s nothing like cutting off your nose to spite your face.  Apparently purposely screwing with people’s schedules and pissing off the riders is a great way to stick it to the man. 

What is this, kindergarten?  Grow up; you make a lot of money for what you do, and your employer is in a constant state of funding distress.  The last thing the Port Authority needs, and deserves is a black eye because some self-entitled workers want to stick it to them.  

Wednesday, August 4, 2010

Really? You're using this?

Poor, poor NSC.  It’s been the regional whipping boy for years now.  It’s taken the leap to the national political stage.  Here’s the article.



I’m no NSC cheerleader, but realize that it’s already near complete and will provide value to the region.  Check out this post for a more detailed opinion.

This is absolutely ridiculous.  Don’t use the NSC as your political pawn to validate your political agenda.  The NSC is not representative of the bailout, and the way in which it is presented is just plain misleading. 

The NSC is such a tiny piece of the overall stimulus package ($62.5 million out of $ 800 odd BILLION dollars).  I could probably find just as many examples of the Stimulus program helping to stimulate job growth as you could find examples like the NSC, but that is not the point of this post.

People constantly argue that the NSC should not have been built, but it was.  If they would have had to stop the project, the 4000 or so jobs related to this project would have been prematurely ended (while the economy was at its worst) and the Port Authority would have inherited tunnels that it could not use but still had to pay for.  You could argue that the cost per rider will be expensive, and it will, but PAT will at least re-coop at least some money through ridership.  If no one is using the tunnels because they could not be completed, then no money is being re-cooped and the tunnels and other related infrastructure would just be sitting there, unused and eating up dwindling Port Authority funding (it still costs money to maintain infrastructure, even if its not in use, especially tunnels that could collapse if not maintained). 

Finally, and here’s the biggest issue I have with this.  You want to blame an administration for the NSC?  Fine, blame the Bush Administration.*  That administration approved the project and funded it to the tune of $348 million (80% of the projected cost at the time of approval).  I could argue that had the Bush administration not agreed to award the money, then the project would not have to be bailed out because it was over budget due to inflation.  I could say that this is another example of the Obama administration having to “bailout” a decision made by the Bush administration.  If you want to look strictly at the numbers of how much each administration has spent on the NSC; the Bush administration spent a lot more on the project than the Obama administration has.  

I am not actually trying to make that statement, but it’s about as accurate as someone saying “look at the NSC, it's bad, it got bailed out by Obama's bailout, Obama’s bailout is bad.”  The point is, the project needed to get finished, and no matter who is in the oval office now, the money probably would have been spent to finish the project.  The funding also just happened to come from Stimulus funding.  If that would not have been available, it probably would have come from somewhere else.

Politics in this country is disgusting.  Nothing can be taken at face value, because nothing is ever presented at face value.  Every “fact” is tilted, twisted and wrung out until it matches an ideology. 

*Blaming the Bush Administration for DOT’s approval of the NSC is just as foolish as directly blaming the Obama Administration for the use of bailout money on the NSC.  I would wager that neither President had direct knowledge of the physical approval for either instance.

Thursday, July 29, 2010

Breaking Down the AVR Proposal Part 1


I’ve been critical of AVR’s plan for commuter rail.  That’s not to say that there isn’t value to what they are doing.  With that in mind I’ve put together some of what I feel are issues/risks/opportunities for this proposal.  I broke the proposal down into construction and operation.  The first installment will cover construction and each section will lay out potential issues and opportunities (if applicable) 

Keep in mind as well, there is no public report available for this.  I’ve gathered my ideas and thoughts through articles and material available on the internet.  There are no concrete figures save the $171million “private loan” and the $228 million overall cost.  Beyond that, there is currently no detail available. 

Construction

Stations

There aren’t many major issues with the construction of stations from Arnold, PA to 26th St. in the Strip. 

There are just a couple of concerns that I think it is important to highlight.

Tarentum Bridge Stop:  One of the issues AVR has apparently taken with the current Commuter Rail study is the lack of a stop past the current end of track in Arnold, PA.  They want to extend the route, approximately a mile north along the river to a stop around the Tarentum Bridge.    


While I don’t have a problem with this in theory, geography makes implementation tricky, and probably expensive.  The east side of the Allegheny River under the bridge is just a thin strip of flat land, with a steep hillside to one side and the river to the other.  There is enough land for at least one track, as this is the former PRR Railroad Allegheny Division right of way.  The tracks are gone, but the right of way is still intact.  However, there is little room for a station with parking and multiple tracks.  Additionally, gaining auto access to this strip of land would be challenging.  If the designers envision direct access from the Tarentum bridge (which I am guessing they will), steep ramps will have to be built from the bridge.  These ramps will need to provide enough clearance for Tugs to operate underneath them.  It can be done, but it would be expensive.  Again, there is no word whether this cost is included in the $228 million figure quoted in the Trib/Post Gazette. 

Another option that could be used would be to either make an access road off of Lower Braeburn Road in Lower Burrell or move the station further north so that it would be situated at the bottom of Lower Braeburn Road.  Both of these have potential issues as well.  I am still not sure there’s enough room underneath the bridge itself for a station, even without using ramps off of the bridge.  Also, with the second option, you will lose the convenience option.  I am betting they are trying to capitalize on the ease of travel to the Tarentum Bridge and therefore maximize on ridership.  If people have to drive out of their way to get to a station that is isolated by geography then there is no real reason to spend the money to put it there.

26th St. Intermodal Terminal:  26th Street is a decision point for the AVR.  They will either keep to their ROW to 16th street, or leave their right of way at 26th St, travel at grade on 26th street and join the Busway on the far side of Liberty.  

If the latter is chosen, this point could become particularly important.  According to this idea, an intermodal terminal would be built at 26th street and the AVR would possibly interchange with an LRT line coming up from downtown (don’t ask me how this would happen…)

The nearby property owners will become important in this instance.  A light rail vehicle can’t just hang a left at an intersection and the Strip is filled with dense development..  To get an idea of what it takes to turn a light rail vehicle, see the below map.



  Land will have to be acquired and buildings potentially demolished.  This is sure to meet with resistance from local business/property owners.  This will add to the already expensive costs of terminal facility construction in an urban environment.

Right of Way Construction:

One advantage that AVR has is that of an existing ROW.  (ahh the joys of existing infrastructure).  They already own the property and the tracks.  All they have to do is upgrade it.  They will have to add stations, passing sidings, signaling, and probably upgrade the road crossing protection over what they currently have.  While still expensive, the hard part (ROW acquisition) is already taken care of. 

That is until…

you get to 26th St. 
As discussed before, the AVR may elect to continue using their right of way and easement to reach 16th St.  If this is the case, while not ideal for operations it is ideal from a cost standpoint. 

The other option would be to operate at grade on 26th St. across Liberty where it would run on (or alongside) the Busway to the Penn Center Station and onto Steel Plaza.  This option could end up being very costly, and may not be physically feasible at all. 


As I alluded to earlier, a train doesn’t turn on a dime.  The line would have to curve to meet 26th St, and again, would probably have to cross a privately owned parking lot.  The AVR would then need permission to dig up the entirety of 26th Street to lay rail.  This would involve closing off Liberty Ave and Penn Ave to dig up the pavement and lay rails. 

I don’t know the timeframe for how long these roads would have to be disrupted for or the cost to install rails and update the traffic control equipment (both for auto traffic and trains). 

The going gets tougher once across Liberty Ave.  There is currently a bridge across the NS Pittsburgh Line that buses use to access the Busway.  There is a grade after Liberty to get over this bridge.  If trains are to use this they must make sure the grade is not too steep to operate.  They also have to ensure that the bridge is rated.  Remember, Light Rail is a relative term (River LINE style cars are approx 20 tons) and they are crossing a highway style bridge.  Assuming those requirements are met the ramp will have to be dug up and tracks laid.

The next challenge is the Busway itself.  After having to emplace a hard right hand curve at the Busway end of the bridge, the line will have to deal with the Busway itself.  This is not privately owned and is owned by the Port Authority.  They must agree to allow tracks to be put into place on their route.  (There is also no indication whether PAT will or won’t be responsible for operating this AVR service).  Again, IF PAT agrees to this request, the Busway will have to be torn up and tracks laid.   As the route would near the Penn Center Station, there is more room and the two routes could operate parallel to each other. 

An additional problem would face this proposal south of the Penn Center Station.  Soon after the station, the T ROW into Steel Plaza goes underground and stays that way for the 1000 or so feet to Steel Plaza.  This would mean that diesel propulsion may not be practical.  At the very least cars would not be allowed to idle in Steel Plaza, and may not be able to be operated underground at all without an electrical back up or third rail system.  Although this would be a short distance requirement, it still would mean additional infrastructure and vehicle costs.  Also, tracks would have to be re-laid because of gauge difference. 

A final construction issue is future T service to the East.  I know it’s a pipe dream, but there has always been talk of making the East Busway into a T line.  Right now that possibility will always be there.  If you built a different gauge line in from the East, you are removing that possibility. 

It’s clear there are some challenges.  I like the idea of the line going all the way to Steel Plaza.  This line is unlikely to ever be able to link in with a like mode of transportation.  Giving people ready access to the T and East Busway to get elsewhere in the city is critical if this service is going to succeed.  It’ seems as though construction is feasible.  The question right now is; is it practical?  

Friday, July 16, 2010

The AVR Saga Continues

I couldn’t resist.  I had to write something after I saw the latest Article in the Trib about the AVR.*  As if that wasn’t enough, there was a follow up article in the City Paper. 

To sum it up: AVR wants to implement service from Arnold to  Steel City Plaza via their current right of way from Arnold to the Strip, breaking off (and I’m assuming) using street trackage on 26th St, crossing Liberty and using the East Busway to gain access to Steel Plaza.  They want to do this because: #1 They feel access to Steel Plaza will provide the greatest intermodality (can’t argue that, given the context) and #2 struggles with property owner below 21st ST (Buncher) continue, even though the STB ruled in favor of AVR owning the easement to their ROW in the lower Strip. 

A couple thoughts on the Trib article: 
I wonder if the Allegheny/Westmoreland County commuter proposal has really “lost steam” as the article suggests.  Granted, not much has been said about it lately, but throughout this planning process, there have been large gaps in time between updates. 

I also get the impression that really no one is on board with the AVR’s proposal, accept the AVR.  County and Port Authority officials seem to be awfully quiet about the whole thing. 

Then the City Paper article popped up.  This article brought up further issues, such as the proposed Buncher TOD development in the Strip.  Included in this was talk of an LRT line to Lawrenceville.  Additionally, the article questioned the validity and thoroughness of AVR’s study on connecting their transit line with Steel City Plaza.  There was no mention of the Allegheny/Westmoreland Commuter Rail proposal in this article. 

A couple thoughts on the CP article:  
Wow, the plot thickens.  I had seen articles about the proposed development in the Strip but had not heard talk about an LRT line to Lawrenceville.  I have to wonder where exactly that all came from (aside from Patrick Dowd’s mouth).  Considering PAT nixed the convention center spur, I don’t know how likely this line to Lawrenceville would be.  I’m certainly not opposed to the idea; however, I'm not holding my breath for them to build one.  Consider that the first Spine Line Study was completed in 1993.  Nearly twenty years later, we are close to having a tiny portion of what was supposed to be the Spine Line (The NSC).

My overall thoughts:  
There have been many developments in a short amount of time.  In addition, I’m not exactly sure what is really going on vs. what is conjecture.  Nothing is guaranteed at this point, not even AVR’s plan.  Dowd’s comments are right on about wanting to increase connectivity within the city, not just into and out of the city.  For my money, I’d rather see an extension to Oakland, transformation of the busway to LRT, or an LRT line to Lawrenceville through the strip before commuter rail. 

Additionally, I have to wonder where the commuter rail plan stands.  Again, if AVR forges ahead as is, they will be creating a single line transit system that will be limited in how it can tie in with other forms of transportation within the region.  You will never have a system of these lines in Pittsburgh where you can get from one point in the region to another (beyond Arnold to Pittsburgh).  A heavy type commuter rail would at least give the ability to operate inter-mixed with freight traffic, and would make the dream of having a system from one end of the county to the other at least a possibility.  As unlikely as that may seem, it is still MORE likely than a similar system using River Line style light rail. 

Having said that, any project that would decrease the number of vehicles on the road and the amount of time that people spend in cars would be welcome.  Commuter rail can spur TOD.  If someone moves to a walkable community near a train station from a suburban cul de sac because it provides access to the city that in itself is a victory.  Oakmont isn’t in the city, but it’s a perfect, ready made TOD community (with the exception of a super market, but I digress).  It would certainly not be a bad thing to expand a walkable community like Oakmont. 

Additionally, as a commenter In the City Paper article suggests, a golden opportunity to generate support for a commuting alternative is being missed here.  Route 28 sees 60,000 cars a day.  Route 28 is also undergoing major construction.  If even 10% of those people are convinced to try AVR’s transit line, that would be a great start to establishing a well patronized and effective commuter alternative.  If some sort of system were not started until, say 2014-2015 time frame, then people would be much less likely to ditch their cars.


As always, I guess the bottom line is:  The more we stand around and talk, the more things don’t change.















*As an aside, I like how the Trib gets their barbs in there specifically about the Port Authority and publicly funded transportation. 
Specifically: 
“Ardolino said the venture would not ask for funding from the cash-strapped transit agency.
"We're trying to keep Port Authority out of this equation," he said. "They have a role, but we'd rather not burden the authority any further."”

Then the subtle jab against publicly funded transportation at the end:
 "I'd be all for it if it would be mostly self-supporting,"
 Of all the quotes during interviews, I find it curious that this one is the one they would include...  

Wednesday, July 1, 2009

LRT System Redux

In an effort to make my proposed LRT idea better (and to brush up on my skizzills for the Great Circulator Battle of 2009) I've updated my previous post from November. Check it aaaht.

Thursday, June 25, 2009

LRT Plan

I found a cool link to another proposed LRT system by way of some comments over at Null Space. Check it out here.

It looks pretty comprehensive and pretty aggressive utilizing at least some, if not all new rights of way which would require the land to be acquired, graded and tracks laid. Additionally, it's not stated by the map's creator, but I am assuming some of the tracks would be underground (i.e. through the South Side and through the Hill District, Oakland, and Squirrel Hill).

It's expensive and unlikely, but boy would I love to have an LRT system like that!

Wednesday, May 13, 2009

The Saga Continues

Strike 1 against the Port Authority's attempts to get funding for the last $60 million or so shortfall to complete the NSC. Read about it here. I'm tired of beating this dead horse. Anyone who has any questions on where I stand with the NSC can read about it here, and here.

Suffice to say, the only thing worse than spending $500+ million to get 1.2 miles of additional track is spending $300 million and getting nothing.

I know this isn't the last of the options, there will be more funding opportunities to cover the shortfall, and according to the article, there is enough money to keep working for another year. Hopefully this project doesn't become the next Wabash Tunnel (I'm referring to the 1st failure, not the 2nd, or 3rd)

Tuesday, May 5, 2009

BRT: Deserving of of its Poor Reputation?

The heat's really been turned up on MBTA's Silver Line BRT service. The Overhead Wire and Transport Politic each have stories about the planned addition to this "system". Without re-hashing the articles, there's a lot of angst among Bostonians and pro-transit people because $115 million dollars is being spent to connect the currently separated "branches" of the Silver Line.

At face value, the concept of connecting the various branches to make a more complete "system" makes sense. However, if you read the details of the proposal vs. the original plan, there is reason for many people to be unhappy. Additionally, many commenters brought up personal experiences with the shortcomings of the Silver Line, including slow speeds through tunnels, awkward transfers, and efficiency issues (i.e. switching from electric power to gas power in the underground segments of the BRT.)

Their views and frustrations are certainly valid, the Silver Line has been poorly planned, and poorly run. Check out this report by the Sierra Club on the Silver Line (It's biased, but does make good points).

All in all there's a lot of information being flung like mud back and forth over the Internet between Pro-BRT agencies like "The National BRT Institute", or "The Bus Rapid Transit Policy Center" and Pro-LRT agencies like "Light Rail Now.org" or "Light Rail Transit Association". Both sets of websites are very one sided, and very biased in their viewpoint about transportation. If a person were to have no knowledge of transit and different modes of transit, and they logged onto Light Rail Now.org, they would leave the website thinking LRT was the best form of transit EVER, and thinking that BRT was garbage. The same goes for pro BRT websites. If a person logged onto a Pro-BRT website, they would leave thinking BRT is amazing, and LRT is a waste of money.

I don't like one sided viewpoints, so I tried to sit down and figure out if BRT really is deserving of its status as the crappy version of LRT. There are some common threads in the arguments that fly back and forth between LRT and BRT folks, which will be discussed individually. These are; which is cheaper to build/maintain, which is more cost effective, and which has the propensity to attract more riders?

Which Mode is Cheaper to build/Maintain?

BRT: BRT advocate's main argument is that BRT provides the same levels of service as light rail, but at a substantially lower construction and maintenance cost. One BRT website reports that the average construction cost per mile for LRT is around $70 million, while BRT is a "mere" $25 million per mile. Additionally, they claim savings in maintenance and operations costs, citing that there is less infrastructure, and simplified vehicle maintenance due to the fact that where as LRT has overhead catenary, a signaling system and rails/ties, BRT has paved road and buses, that are essentially no different from other buses which operate on the street, thus simplifying maintenance facilities, and employees needed.

LRT: LRT' advocates counter that these claims are a mirage. That in fact, Busways can be just as expensive as LRT if not more. They cite Pittsburgh's own West Busway as their main example. Which, like every other Port Authority project since the beginning of time has come in late and over budget. The cost of the project was $320 million for 5 miles of Busway, or roughly $40 million per mile. LRT advocates also claim that any cost savings in construction and lower overhead for maintenance are outweighed by the fact that the guideway for a BRT system has a MUCH shorter lifespan, along with the shorter lifespan of the buses vs. LRV's.

My Take: Edge BRT. There's a couple facts that should be taken into account. The West Busway was insanely expensive, and its cost per mile is much higher than what BRT advocates state the average cost per mile should be. However, that cost of $40 million is less than the average LRT. (Look at the NSC, if you DON'T count the tunnels, the construction cost per mile is approx $166 million*)


Which mode is More Cost Effective?

BRT: Advocates claims that BRT is more cost effective because the overall construction and maintenance costs are lower, and you get all the benefits of LRT. They even claim some advantages that LRT can not share, such as the ability of certain bus routes to operate at grade for portions of their route, and on the guideway for parts of ther route (for example, the Allegheny Valley Flyer which travels to East Liberty at grade, and then bypasses the bulk of Pittsburgh traffic by traveling the last 5 or so miles into Downtown on the Busway.)

LRT: LRT advocates claim that these benefits are overstated, and that BRT cannot provide the levels of service that LRT can. A study conducted by the city of Hamilton, Ontario found that in every city surveyed but one, operations and maintenance costs per rider were LESS for LRT vs. BRT.

My Take: Rest of the world, Edge LRT (Pittsburgh, Edge BRT). Why is that you say? There is a big caveat to this study; wanna know the only city whose cost per rider was higher for LRT than BRT? That's right, Pittsburgh. Across the board in Pittsburgh it costs more per passenger to run the T than it does to operate and maintain all three busways. The Hamilton report surmises that has to do with Pittsburgh's relatively low population vs. some of the other cities studied, such as Portland, San Diego, and Denver.

Which has the Propensity to Attract More Riders?

BRT: This is the one point the BRT advocates will readily wave the white flag on. They have recognized that the public prefers rail, whether it be a heavy metro or LRT. There are numerous studies on both websites to back this statement up. Even the BRT websites have not tried to directly challenge the assertions that BRT is less attractive to riders than LRT. Instead, they have undertaken studies on how to make BRT more attractive to those who prefer rail. (In short, their proposed answer is, make it as much like rail as possible).

LRT: Who's to argue with logic like that? When the BRT folks are conceding that they are not as attractive to riders, there's not much more to say.

My Take: Rest of the World: Edge LRT. Pittsburgh: Push. Once again, Pittsburgh bucks the trend. Pittsburgh's busways carry on average 17,000 more people per day than the T.

In most cases is LRT superior to BRT, in my unqualified opinion, yes. However, I think there is a tendency to dismiss BRT and I believe that notion to be a little bit short sighted. Clearly in the case of Pittsburgh, the Busway system has been very successful when you compare it to the T. Busways carry more riders and do it for less money.

Is a BRT a sure fire option over LRT? Of course not, but LRT is not always guaranteed to be a better option than BRT. In a place like Boston, BRT doesn't necessarily make sense, especially given the existing infrastructure and dense population. However, in a smaller population city like Pittsburgh, it's clear that BRT can fill a vital role. It can provide high quality, and rapid service by taking buses of the street and putting them on their own separated grade guideway, and do it more effectively than LRT. The point is, maybe urban planners need to look at both options, and don't just look at the biased opinions of special interest groups who clearly have an agenda beyond providing efficient transit service.

Monday, May 4, 2009

Connect '09 Recommendations Announced

The results of the Port Authority's Connect '09 study have been released. The report has not been uploaded to the website yet, but it should be soon, as the Post Gazette and Trib both have stories detailing the findings.

The report focused on three main options to improve efficiency and service (in no particular order): The Grid system, Better Radial System and Better Radial "Plus"; all of which are designed to reduce costs while increasing efficiency and ridership.

The "Grid System" idea was axed pretty quickly because it involved a number of feeder routes to existing separated grade lines, such as the T or East/West Busway. It was determined that this would not generate the needed ridership, and would also increase costs and lead to increased fares. (This is a shame, I think this concept has promise if you have a robust enough backbone system to support such operations. Think Chicago or Boston)

The "Better Radial System" is still in the running. This system maintains Downtown and Oakland as urban "hubs" and concentrates on moving people to these two hubs. As a result, some service would focus on moving people primarily to Oakland (thus bypassing Downtown) and moving others primarily to Downtown (thus bypassing Oakland). This would ultimately speed service to those hubs by reducing the number of buses and routes that have to get stuck in Downtown traffic BEFORE getting to Oakland, and visa verse.

The third system, known as The "Better Radial System PLUS" involves the changes outlined in the Better Radial System, and also involves a number of significant improvements to bus service. In my mind, this is the best choice of the two remaining choices, however, it will involve more investment to get it running than the "Better Radial System".

  • "Rapid" Bus Service: 61 series, 71 series and 500 would become like a "BRT light" system used by other transit authorities. Changes would include dedicated lanes where possible, priority signaling at intersections, upgraded stations, and "limited" service (A reduction in number of stops). This operation would be similar to Los Angeles Metro's "Rapid" service.
  • 28X, more of an "Xpress": Right now, the 28X Oakland to Airport service has a slow meandering route to the airport that includes a number of stops in Robinson Town Center. Operational changes under this idea would have the 28X bypass Robinson Town Center, slashing transit time to the airport. RTC access would be provided by extending the current 100 route.
  • More bus only lanes: This service concept would provide for bus only lanes (like 5th Ave in Oakland), and priority signaling wherever possible.

Universal Changes proposed include:

  • Reduce the 16,000 stops on the Port Authority system by a significant number (The actual number, I believe will be determined by another round of studies)
  • Eliminate variations of a single route
  • Route number overhaul (YES!) which would change many bus route numbers and get rid of the antiquated T route numbering system completely in favor of a color coded system.
  • Construction of new park and ride facilities.
  • Downtown routes would centralize on fewer streets with fewer stops, with the goal of simplifying operations and improving efficiency.
  • Creation of "transit centers" throughout Allegheny County in areas where several routes converge, i.e. RTC or East Liberty. These centers would have updated schedule information, as well as a climate controlled environment.
Overall, not too shabby, there's nothing glaringly wrong with this plan. I also like the basic premise, transit improvements on a budget, making the most out of the system we and resources we have Right Now.

I know this study was based on things we can change right now, but I still would like to see a capital improvement plan that would, ohhhh I don't know, get us an integrated separated grade transit system (See any recurring themes here?)

Wednesday, April 29, 2009

Reaching for the Stars

Today's Post Gazette and Tribune Review* had an article about an ambitious (that would be an understatement) plan for rail service in Pittsburgh and Allegheny County. Dan Onorato is requesting a total of $17.5million dollars for this plan. $10.5 million of this request is to get the New Ken to Pittsburgh commuter rail plan off the ground, and $7 million is to begin studies on an LRT link to the airport, an LRT link to Oakland (could it be...the Spine Line completed??!!!) along with a "people mover" system to connect Pittsburgh's neighborhoods.

Wow, that's a lot, and if you scroll down further through the article you will find that the price tag for all this is a measly $3.5 Billion. Mr. Onorato feels that now is the time to act and take advantage of the "...sea change of philosophy in Washington." He has requested the help of Reps Mike Doyle, and Jason Altmire, an outspoken transit proponent to secure this money.

First of all, however realistic this plan is or how likely the funding is to occur, I've gotta hand it to the guy, I like the way he thinks. A world class city deserves world class transportation.

My idealistic side thinks that Dan Onorato and Jason Altmire are forward thinkers who have a great vision of what transportation and transit should be in the region and are willing to go for it.

However, my pragmatic side has to get his side of the story in. Does anyone really believe that this will happen? I like just about everything that Dan Onorato is quoted as saying in this article. However, history is not on his side. Additionally, people didn't like the $500 million for the NSC, do you think they will it like if you change the M to a B? I know that Pittsburgh would get so much more out of this project than the NSC, but I think the average tax payer is only looking at the price tag, and not what you're getting for the price.

Having said that, there are a lot of options here. If Pittsburgh could just get one of the "options" discussed by Dan Onorato, it would be great. I would take a "people mover", I would take a downtown to Oakland LRT, and I would even take an LRT line to the airport.

For now, I'm happy for what we've got. By that I mean, I'm glad we've got at least two progressive leaders who are taking steps to improve mobility, and actively improve our city, and our region.

*Just Kidding! The Trib doesn't actually cover transit, unless it's to bash the NSC.

Tuesday, April 28, 2009

A Different Take on Inter-Connection

I've written before about the fragmented, and generally half-assed nature of Pittsburgh's transit "system". I also proposed my own design for a separated grade LRT system to help Pittsburgh have a more complete transit system. Now it's time for BRT to get its due. I've said before that I am pro-light rail, but honestly, from my perspective, whether I am riding a bus on the busway or an LRV on rails, I can still get downtown in about 5 minutes. That's what I care about.
The big difference between a true BRT and LRT is not whether the wheels are steel vs. rubber, or not what the wheels travel on; the big difference is in public perception, but that is another topic for another blog.

If we could have an interconnected LRT system, why not a BRT system? We already have busways that radiate in three different directions (East, West, and South) with just a few short miles between them, vs the single LRT corridor into the South Hills. The problem right now are those few short miles between them. With the current system, if the Port Authority were to create a bus that would go from Swissvale to Carnegie (basically the entire East/West Busways) the bus would have about a two mile stretch where it would have to contend with the streets of Downtown. The same goes for a bus that would travel the entire length of the East and South Busways. In my mind, running busway buses on regular streets to bridge the gap between busways is not an acceptable option.

What is a city to do? Simple, we create a link between them. I know what everyone's going to say, we can't afford that, or perhaps that it's just plain stupid. Luckily, my favorite two words make me think otherwise, existing infrastructure.

East Busway

Stay with me here, The East Busway would not end at Penn Station, it would continue, under the Post Office (on the Penn Park Branch of the T which is currently unused). The busway would travel THROUGH Steel Plaza where it would meet with the South Busway.

South Busway
The South Busway currently ends at Station Square. With my idea, it would continue to share rights of way with the T, all the way across the Panhandle Bridge, through the First Ave. station to Steel Plaza where it would meet with the East Busway.

West Busway
The West Busway is currently the most "isolated" of the three current Busways. It currently ends near Corliss St. Buses then travel via Carson St. to make their way downtown. This busway creates a challenge because it is the most "isolated" and there is really no good way to connect it with the other two busways. Luckily, we could get 7/8 of the way there.

The Wheeling and Lake Erie Railroad has a branch line that connects to their main line around the Wabash Tunnel and travels over the parkway where it meets the CSX mainline near the West End Circle. This track is unused, and has been for some time. This would be an excellent ROW for West Busway. It would parallel Saw Mill Run BLVD until the Wabash tunnel, where it would cross over Saw Mill Run BLVD on an abandoned railroad bridge, through the Wabash Tunnel to Carson St. Once at Carson St., the buses would take to the public roadway for a few hundred feet until it would meet up with the South Busway and the T at the Station Square stop.

Potential Issues

Why do I get the feeling this idea is going to go over like a fart in church? I can just see the comments now, about how it's unfeasible, and listing a million different reasons why it can't happen. Well, I racked my little brain is best as I could to address potential problems with the plan and here's what I came up with:

1. Emissions or exhaust inside tunnels and at Steel Plaza: There is an easy solution to this one. Hybrid buses, or even electric buses. Look, they're a good idea to have anyway for their environmental benefits, why not at least invest in them for busway service? Boston has a busway called the Silver Line that operates underground, but uses rubber tire electric buses on the route.

2. Operation of LRV's and buses on a shared right of way: This is not an issue because it already happens, buses and LRV's share the Mount Washington Transit tunnel with each other and they share right of way across route 51, before the South Busway splits off. Even with this idea, the two would not share right of way for more than a few miles. Even if speeds had to be limited to, say 15 mph, it's still a steady 15 mph, instead of slow, choppy movement through the streets of Downtown.

3. Clearance restrictions along shared rights of way: This obstacle would probably be the hardest to overcome. The first issue is that buses don't operate at high platforms, the T does. Platforms at Steel Plaza and 1st Avenue would have to be lowered, or at least parts of them would have to be lowered. The more problematic issue is buses bouncing off of high platforms and bridge abutments. I do know that an LRV is 105" wide where as the current Busway vehicles used by the Port Authority are 102" wide. This means an LRV vehicle is 4" wider than a bus, so clearance between vehicles traveling in opposite directions should not be a problem. That would also give buses some breathing room when operating near high platforms. However, I still don't know if I have a good answer for that dilemma. Perhaps some sort of guideway at stations could keep the buses in the right path (think the little track at the car wash that pulls your car through the car wash).

Operations

Given an inter-connected system of busways, the best way to operate it would be the the same way you would an LRT or any other rapid transit system. Use a color code, maybe a Red line from Carnegie to Swissvale, and have a Blue Line from the South Hills as far as downtown. At downtown, someone could transfer if they desired to do so.

This could be an excellent, inexpensive way to connect the closest thing Pittsburgh has to a rapid transit system. If feasible, this could be the perfect keystone to an expanded BRT system in Pittsburgh. If it's not feasible to connect the busways in this manner, hey, I'm just a history major who likes to blog about transit!

Tuesday, March 17, 2009

The Maglev again??? Are you freakin' kidding me!!???

I was perusing the land of transit-hate known as The Pittsburgh Tribune-Review, and found a very interesting, and I have to say disturbing article about the Pittsburgh Maglev project. This project that somehow seems to cling to life is ready to receive another shot in the arm.

Before I bash this project (and I will), I will tell you that I am not against MAGLEV technology. It's potential to move people between cities cleanly and VERY quickly (in excess of 200MPH) is very attractive. I also think that the fact that the main proponent company named MAGLEV Inc. is local company in McKeepsort is great as well.

The only problem is, the Maglev is a TERRIBLE idea for a local rapid transit. It's incredibly expensive, and I think would be a better application over a long distance route (from Pittsburgh to Philly.)

According to an article in the Pittsburgh Business times from '07, the last cost estimate done for the project was done in 2003, and at that point it was over $3 Billion for the 54 mile proposed line. If we all know anything about transit cost estimates, is that they tend to run over, just a little bit. They run over even more during times when material costs are high. Just look at the NSC (North Shore Connector), three years ago it was supposed to cost $435 Million, barely 3 years later, the cost is now $552 million.

Imagine the inflation on $3 Billion over 6 years. That's assuming that they start tomorrow. Who knows the actual date that construction would begin. By that point, more years could elapse and more inflation could occur.

Price alone should not necessarily kill the project, but look at what you are getting for the cost. You are getting a single route from Greensburg to the airport, with stops in Monroeville, Downtown, and the airport. Just how many people would really need to take the trip to the airport these days? Flights are waaaaaaaaaayyyyyyyyyy down. The only real potential would be as a service to daily commuters from Greensburg, and perhaps from the airport (but I can't say how much of a market there really is for that) It could certainly attract riders in that capacity, but I don't know if that would outweigh the costs. The way the route is set up, I don't really see an additional value to it. Additionally, if it is only operating in this capacity, how much money is wasted by not operating during off-peak or off rush hour time periods?

There is enough transit half-assery in Pittsburgh already. You've got a number of incomplete and non-integrated( The T, and Busways that don't interconnect in any way) modes of transit already in place in Pittsburgh. We don't need a $3 Billion + addition to that list. Additionally, we've already spent a half a BILLION dollars to get across the Allegheny River. Do we really want to call that good enough? In my mind, and like I said in my post yesterday, one of the few silver linings about the NSC is at least it could be a spring board for expanding the T into the North Hills, or in the general direction of the airport. There is a limited chance that would take place if the NSC were the only major project, but there is a ZERO chance if the NSC was competing with a multi-billion dollar project in the Maglev.

I like the Maglev, its a great concept for intercity travel, but it's the wrong form of transportation at the wrong time in Pittsburgh.