Showing posts with label Public Private Partnerships. Show all posts
Showing posts with label Public Private Partnerships. Show all posts

Monday, November 22, 2010

AVR Commuter Rail Operations Part 1

Ok,  I’m FINALLY getting to this.  I know there’s a lot going on, and a lot of it is negative.  I’d like to focus on something that is moving forward, at least for the time being.  I was going to do this in one post, but it got a little O.O.C. so it’ll be broken up into three. 

Dispatching

Before I get into the whole light rail/freight separation thing, we can get the “easy stuff” out of the way.  Dispatching of this operation would be vary very little from dispatching a “heavy rail” operation.  A dispatcher would oversee operation, line signals and manage the movement and protection of the trains.  The bigger question is who would run it.  I can’t say for sure if AVR has dispatching factored into its annual operating cost in its study of this service.  I do know that they will be on the hook for it.  I would be very surprised if CSX would take on this responsibility, and there’s no way the NS would get involved.  Additionally, as The Trib so wonderfully put it, they wouldn’t want to burden the Port Authority with any further responsibility, so the AVR looks to be on the hook for all operations including dispatching.  A cost issue, which must be taken into account is night-time operations.  If a signal system is installed (it would have to be) it can’t just be shut off at night.  It takes written FRA approval to shut down a signaling system.  That means that the lone night time train would require a third shift dispatcher.  Hardly an effective use of money. 

The next question is what operating rules they would use.  NORAC would make the most obvious choice, and is used by NJT on their RiverLine.  Most other rulebooks are railroad specific, but NORAC provides rules which are used by multiple railroads, especially in the Northeast/Mid Atlantic region. 

Time Seperations

I’ve talked a lot about light rail intermixed with freight traffic and I’m not a big fan of these types of operations, except in cases where the freight operating window is very narrow (think a few hours) because of the FRA requirement of a “temporal separation” between freight traffic and light-rail passenger operations.  If you’re going to run a commuter service, then in my mind it should be heavy rail, but that’s another discussion for another post. 

If this operation is envisioned to be a purely commuter style operation, then the separation called for by the FRA isn’t a big problem.  Passenger trains would operate mostly into the city during the day and out of the city at night.  Operations would end probably somewhere around 8 or 9 PM, allowing the AVR to serve its customers, and would then begin early in the morning. 

The problem with this is, however, it limits the operation’s effectiveness for TOD and also in getting people out of their cars on nights and weekends.  What’s the attraction to living close to transit that doesn’t operate when you need it (outside of work)?

If this operation is to be, as some have painted it, as an intra-city link to move people from downtown to the Strip/Lawrenceville area, then this could be a challenge (not to mention I question this operation’s value in that capacity).  A subsequent separation or several separations would have to occur on a daily basis for this to work.  For example, a certain portion of the line (say above Oakmont) could be made available for freight operation after a given time (10 PM for example), while the southern portion could remain off-limits to freight until a later time (1 AM, for example).  One problem with this, however, is that the northern portion of the line is isolated.  AVR trains must enter at one of two spots, the first around 33rd St. which uses their own rails, or via NS’s Brilliant Branch, which would require further trackage rights and an extended back-up move. 

To accomplish this, another window would have to be established, earlier, say after rush hour but before the “nightlife” kicks in.  Passenger operations would have to be banned entirely during this period and all passenger equipment clear of the line and properly secured.  The AVR could then enter the line and travel north towards New Kensington.  Once the train cleared a certain point (say a controlled point in or around Oakmont) AND a certain time was reached, passenger operations could then resume on the southern portion of the line until later that evening, when passenger operations would be suspended for the evening and the AVR could service customers south of Oakmont.  See the list below for a (hopefully) better explanation.

6AM to 7 PM-Passenger only operation.  No freight operation allowed*
7 PM to 8 PM-Freight only operation, no passenger operation allowed**
8PM to 1 AM-North of Oakmont:  Freight only operation, no passenger operation allowed. 
8PM to 1 AM-South of Oakmont:  Passenger only operation, no passenger operation allowed.
1 AM to 6 AM Freight only, no passenger operations   

Clearly it’s doable but complicated.  I’ve heard of an FRA waiver that could be applied for to allow simultaneous operation, but I don’t know how practical this is considering NJT’s RiverLine was supposed to be operated in this manner but could is still operated with the time separation after 6+ years of operation. 

*EDIT*
I did a little more digging and found out that the RiverLine is operating under waivers.  However, it's not as straightforward as I thought.  Apparently a waiver is required just to let freight trains use an interlocking or controlled point that has a physical connection to the RiverLine (ridiculous).  Additionally, it appears that a waiver is required for a freight train to even operate on a separate but parallel track to an active light rail track (also ridiculous).  New Jersey Transit and Conrail were approved for these waivers and are operating under them, but these waivers do NOT allow for freight traffic to operate on the same track at the same time as passenger traffic.

These waivers would certainly have an effect on AVR's operation.  The freight would have to enter at a controlled point, remotely controlled by a dispatcher.


View AVR Freight Connection in a larger map

 The AVR also has a track that continues over the Allegheny River and interchanges with the Buffalo and Pittsburgh at Bakerstown, PA.  Because this line (the former B&O Railroad P&W sub) sees freight traffic on an as needed basis and because there is a physical connection between this line and AVR's proposed service, a waiver would be required.

The whole issue of temporal separation could be avoided by dedicating one track to freight and one to passenger.  The line was at one time double track so it is possible, but again, some sort of waiver would be required.  



*This means that no heavy freight cars, engines or trains can move on or occupy any main track, and must be secured against movement

**This means that no passenger trains can move on or occupy any main track, and must be secured against movement.

Thursday, July 29, 2010

Breaking Down the AVR Proposal Part 1


I’ve been critical of AVR’s plan for commuter rail.  That’s not to say that there isn’t value to what they are doing.  With that in mind I’ve put together some of what I feel are issues/risks/opportunities for this proposal.  I broke the proposal down into construction and operation.  The first installment will cover construction and each section will lay out potential issues and opportunities (if applicable) 

Keep in mind as well, there is no public report available for this.  I’ve gathered my ideas and thoughts through articles and material available on the internet.  There are no concrete figures save the $171million “private loan” and the $228 million overall cost.  Beyond that, there is currently no detail available. 

Construction

Stations

There aren’t many major issues with the construction of stations from Arnold, PA to 26th St. in the Strip. 

There are just a couple of concerns that I think it is important to highlight.

Tarentum Bridge Stop:  One of the issues AVR has apparently taken with the current Commuter Rail study is the lack of a stop past the current end of track in Arnold, PA.  They want to extend the route, approximately a mile north along the river to a stop around the Tarentum Bridge.    


While I don’t have a problem with this in theory, geography makes implementation tricky, and probably expensive.  The east side of the Allegheny River under the bridge is just a thin strip of flat land, with a steep hillside to one side and the river to the other.  There is enough land for at least one track, as this is the former PRR Railroad Allegheny Division right of way.  The tracks are gone, but the right of way is still intact.  However, there is little room for a station with parking and multiple tracks.  Additionally, gaining auto access to this strip of land would be challenging.  If the designers envision direct access from the Tarentum bridge (which I am guessing they will), steep ramps will have to be built from the bridge.  These ramps will need to provide enough clearance for Tugs to operate underneath them.  It can be done, but it would be expensive.  Again, there is no word whether this cost is included in the $228 million figure quoted in the Trib/Post Gazette. 

Another option that could be used would be to either make an access road off of Lower Braeburn Road in Lower Burrell or move the station further north so that it would be situated at the bottom of Lower Braeburn Road.  Both of these have potential issues as well.  I am still not sure there’s enough room underneath the bridge itself for a station, even without using ramps off of the bridge.  Also, with the second option, you will lose the convenience option.  I am betting they are trying to capitalize on the ease of travel to the Tarentum Bridge and therefore maximize on ridership.  If people have to drive out of their way to get to a station that is isolated by geography then there is no real reason to spend the money to put it there.

26th St. Intermodal Terminal:  26th Street is a decision point for the AVR.  They will either keep to their ROW to 16th street, or leave their right of way at 26th St, travel at grade on 26th street and join the Busway on the far side of Liberty.  

If the latter is chosen, this point could become particularly important.  According to this idea, an intermodal terminal would be built at 26th street and the AVR would possibly interchange with an LRT line coming up from downtown (don’t ask me how this would happen…)

The nearby property owners will become important in this instance.  A light rail vehicle can’t just hang a left at an intersection and the Strip is filled with dense development..  To get an idea of what it takes to turn a light rail vehicle, see the below map.



  Land will have to be acquired and buildings potentially demolished.  This is sure to meet with resistance from local business/property owners.  This will add to the already expensive costs of terminal facility construction in an urban environment.

Right of Way Construction:

One advantage that AVR has is that of an existing ROW.  (ahh the joys of existing infrastructure).  They already own the property and the tracks.  All they have to do is upgrade it.  They will have to add stations, passing sidings, signaling, and probably upgrade the road crossing protection over what they currently have.  While still expensive, the hard part (ROW acquisition) is already taken care of. 

That is until…

you get to 26th St. 
As discussed before, the AVR may elect to continue using their right of way and easement to reach 16th St.  If this is the case, while not ideal for operations it is ideal from a cost standpoint. 

The other option would be to operate at grade on 26th St. across Liberty where it would run on (or alongside) the Busway to the Penn Center Station and onto Steel Plaza.  This option could end up being very costly, and may not be physically feasible at all. 


As I alluded to earlier, a train doesn’t turn on a dime.  The line would have to curve to meet 26th St, and again, would probably have to cross a privately owned parking lot.  The AVR would then need permission to dig up the entirety of 26th Street to lay rail.  This would involve closing off Liberty Ave and Penn Ave to dig up the pavement and lay rails. 

I don’t know the timeframe for how long these roads would have to be disrupted for or the cost to install rails and update the traffic control equipment (both for auto traffic and trains). 

The going gets tougher once across Liberty Ave.  There is currently a bridge across the NS Pittsburgh Line that buses use to access the Busway.  There is a grade after Liberty to get over this bridge.  If trains are to use this they must make sure the grade is not too steep to operate.  They also have to ensure that the bridge is rated.  Remember, Light Rail is a relative term (River LINE style cars are approx 20 tons) and they are crossing a highway style bridge.  Assuming those requirements are met the ramp will have to be dug up and tracks laid.

The next challenge is the Busway itself.  After having to emplace a hard right hand curve at the Busway end of the bridge, the line will have to deal with the Busway itself.  This is not privately owned and is owned by the Port Authority.  They must agree to allow tracks to be put into place on their route.  (There is also no indication whether PAT will or won’t be responsible for operating this AVR service).  Again, IF PAT agrees to this request, the Busway will have to be torn up and tracks laid.   As the route would near the Penn Center Station, there is more room and the two routes could operate parallel to each other. 

An additional problem would face this proposal south of the Penn Center Station.  Soon after the station, the T ROW into Steel Plaza goes underground and stays that way for the 1000 or so feet to Steel Plaza.  This would mean that diesel propulsion may not be practical.  At the very least cars would not be allowed to idle in Steel Plaza, and may not be able to be operated underground at all without an electrical back up or third rail system.  Although this would be a short distance requirement, it still would mean additional infrastructure and vehicle costs.  Also, tracks would have to be re-laid because of gauge difference. 

A final construction issue is future T service to the East.  I know it’s a pipe dream, but there has always been talk of making the East Busway into a T line.  Right now that possibility will always be there.  If you built a different gauge line in from the East, you are removing that possibility. 

It’s clear there are some challenges.  I like the idea of the line going all the way to Steel Plaza.  This line is unlikely to ever be able to link in with a like mode of transportation.  Giving people ready access to the T and East Busway to get elsewhere in the city is critical if this service is going to succeed.  It’ seems as though construction is feasible.  The question right now is; is it practical?  

Thursday, July 22, 2010

I'll Pull My Funding if You Pull Yours

As I stated in my previous post and now that I've had a little time to calm down; I am 100% in support of pulling all state funding from the Port Authority (and SEPTA for that matter) with the caveat that the state no longer maintain any roads or fund any new roads.  Counties and municipalities would be on the hook to maintain all existing roads and fund any new road construction or expansion, to include limited access highways without the help of state funds. 

It’s hard to hypothesize what this would be like because it is unprecedented.  It's even harder to imagine how it would be all funded; not a pretty scenario given our auto-centric society. 

The only real “case study” of this is E-470 in Eastern Colorado.  It’s a Public/Private limited access highway that extends from Meridian, CO southeast of Denver, past Denver International to Broomfield, CO, northeast of Denver.  It’s basically a half moon shaped highway which forms the eastern half of a beltway around Denver.  Its western half was built and is maintained by the State of Colorado. 

E470 is maintained and tolled by a private company and has a public board consisting of the municipalities that the road travels through.  They set toll rates and oversee the operation and finances of the E470 highway. 

As of 2009 the average toll is 31 cents per mile for a two axle vehicle.    The toll is higher if it is a tandem axle vehicle.  The road was built and financed through private bonds and cost approx. $ 1.23 Billion dollars or about $25,751,072.96 per mile ($1.2 billion/46.6 miles)

If we take that $.31 per mile and say we drive five miles back and forth (a total of 10) each day to work.  The total per day would be $3.10.  Driving the route 5 times a week would cost us $ 15.50.  Driving 50 weeks out of the year would cost $775. 

In our current system, a person could avoid tolls altogether by using a publicly funded road that may parallel this limited access highway.  However, if all roads were locally funded, avoiding this toll may not be possible.

Again, this is just a small example using available information.  However, if local municipalities had to pay for new road construction and road maintenance (including limited access) they would be hard pressed to fund those requirements.  Those requirements would make a system such as the E470 highway entirely possible on a larger scale.  In this case, that $775.00 could be and most likely would be MUCH higher. 

Even if a system like the E470 weren’t adopted on a wide scale, communities would have to garner the revenue somehow. In that case, it's likely that local governments would resort to the thing that everyone hates to begin with; taxes.

So, once again, anyone willing to trade privatized transit for privatized roads, I’m all for it.  That way everyone can finally see that no form of human transportation, be it automotive, rail, air, or bus is un-subsidized.