Wednesday, September 9, 2009

Something from Nothing

I've (finally) looked through the TDP and there's enough information out there on the net and in print as far as analysis of the TDP goes, so I figured I would take a little bit of a different view. I decided to pick the best of the best; the route change which, in my opinion was the best "new" look created as part of the TDP.

This year's Something out of Nothing award goes to: The G2 West Busway/Downtown/Oakland (Formerly known as the 100) (check out page 203 of the document). The Port Authority took a route that had some value, gave it additional responsibilities/routing and the route ultimately came out a much improved product.

Why do I like this so much, you ask? Simple, it creates a route that increases interconnectivity, maximizes grade separation that will increase not only its own efficiency but efficiency on additional routes. As any of you who read this blog with any regularity will know, I love interconnection, separated grades, and efficiency.

The new routing starts in Robinson Town Center, and travels the Parkway to the West Busway, through downtown to the East Busway to Oakland. It returns by the same route. The old route started in Carnegie, traveled on the West Busway, and made a big loop in the East End, meaning it went via the East Busway to Oakland and returned downtown via 5th Ave and Boulevard of the Allies.

First of all the routing is much improved. By routing the G2 on the East Busway in both directions, the transit time between the two will be quicker, and will have fewer stops. This will make it a more attractive option for students trying to get downtown or to Robinson. To me this is an incredibly simple change that will pay dividends.

Secondly, by extending the route to Robinson, the G2 will take on the 28X's responsibility of stopping in Robinson Town Center (the bane of any rider's trip to the Airport in the past). This could potentially increase ridership on the G2 in addition to the fact that the 28X(R28) will now be able to shave a significant amount of time off its schedule making its service more appealing. A good scenario for both routes.

In some of the more sensationalized, attention grabbing headlines I have seen concerning the TDP; they have advertised it simply as the latest in a series of "route cuts". Not so my friend, and the new G2 is the perfect example proving that the program is not just another in a long series of "route cuts".



Note: The Port Authority needs to clean up the maps vs. route descriptions on the TDP website. If I look solely at the map, it seems that the new G2 will operate between 6 AM and 12 PM, and will use the existing route structure once across the river (between downtown and Oakland). If I read the draft recommendations document, it states that the bus will operate from roughly 6 AM to 12 AM and will use only the East Busway in both directions from downtown to Oakland.

Saturday, September 5, 2009

Rapid Buses, Noise, and Customer Service

TDP and the BRT

I haven't been focusing as much on the TDP perhaps as I should be, but as usual, Paz over at Politics and Place gives some good analysis on some fluff on the TDP concerning rapid buses. For my two cents, if Pittsburgh wants to emulate anything they should emulate L.A. which has developed a comprehensive "rapid" bus system and has taken BRT further than any other transit agency in the nation with its Orange Line and Rapid services. When it comes to levels of bus service, L.A. is a standard we should work towards.

Quiet Buses

This may be one of the most exciting topics I have ever written about in the short history of this blog. That's right folks, bus mufflers. Even if you're not transit-geek enough to notice by looking, if you ride the bus, you've probably noticed the noise improvement because of the distinct lack of that loud obnoxious Port Authority bus sound and the frequent plume of black smoke.

I love these things for several reasons:

1. Makes buses quieter

2. Gives buses, and transit in general better PR

3. Potential emission improvements

I'm not sure if these new mufflers are actually filters as well, or if they are just mufflers. I searched the web and Port Authority's website but couldn't really find out much information that would point to whether these new exhausts were filters or not. I attempted to contact the Port Authority but (surprise, surprise) have not received a response.

If indeed these new exhausts are filters, my first question, is why the hell aren't they on all the buses. This ties in well with my post about the emission reduction grants. Spare the hybrid buses for now, and improve your whole fleet using the federal money. I do not know the price of these exhausts, but think of the number old stinky buses that you could fit for the price of one hybrid bus. I don't have the facts to really do a comparison analysis, but the question is; is anyone at the Port Authority doing the analysis? Has anyone asked the question whether it would create a greater benefit in emission reduction to outfit all the buses with this new filter or get a few hybrid buses? From my experiences with the Port Authority, my guess is probably not.

Customer Service, or Lack Thereof

I don't have that much experience with other transit agencies, but good god is the Port Authority not-user friendly. From rude drivers, to tying to get information of any kind (other than schedules), I have had so many headaches it's ridiculous. When I do a post about the Port Authority that requires technical information from the Port Authority, I pray that I can find it elsewhere, because trying to get it either from calling them or through their online comments section is like pulling teeth. What are your experiences? I have a hard time believing I am alone in this experience.





Tuesday, May 5, 2009

BRT: Deserving of of its Poor Reputation?

The heat's really been turned up on MBTA's Silver Line BRT service. The Overhead Wire and Transport Politic each have stories about the planned addition to this "system". Without re-hashing the articles, there's a lot of angst among Bostonians and pro-transit people because $115 million dollars is being spent to connect the currently separated "branches" of the Silver Line.

At face value, the concept of connecting the various branches to make a more complete "system" makes sense. However, if you read the details of the proposal vs. the original plan, there is reason for many people to be unhappy. Additionally, many commenters brought up personal experiences with the shortcomings of the Silver Line, including slow speeds through tunnels, awkward transfers, and efficiency issues (i.e. switching from electric power to gas power in the underground segments of the BRT.)

Their views and frustrations are certainly valid, the Silver Line has been poorly planned, and poorly run. Check out this report by the Sierra Club on the Silver Line (It's biased, but does make good points).

All in all there's a lot of information being flung like mud back and forth over the Internet between Pro-BRT agencies like "The National BRT Institute", or "The Bus Rapid Transit Policy Center" and Pro-LRT agencies like "Light Rail Now.org" or "Light Rail Transit Association". Both sets of websites are very one sided, and very biased in their viewpoint about transportation. If a person were to have no knowledge of transit and different modes of transit, and they logged onto Light Rail Now.org, they would leave the website thinking LRT was the best form of transit EVER, and thinking that BRT was garbage. The same goes for pro BRT websites. If a person logged onto a Pro-BRT website, they would leave thinking BRT is amazing, and LRT is a waste of money.

I don't like one sided viewpoints, so I tried to sit down and figure out if BRT really is deserving of its status as the crappy version of LRT. There are some common threads in the arguments that fly back and forth between LRT and BRT folks, which will be discussed individually. These are; which is cheaper to build/maintain, which is more cost effective, and which has the propensity to attract more riders?

Which Mode is Cheaper to build/Maintain?

BRT: BRT advocate's main argument is that BRT provides the same levels of service as light rail, but at a substantially lower construction and maintenance cost. One BRT website reports that the average construction cost per mile for LRT is around $70 million, while BRT is a "mere" $25 million per mile. Additionally, they claim savings in maintenance and operations costs, citing that there is less infrastructure, and simplified vehicle maintenance due to the fact that where as LRT has overhead catenary, a signaling system and rails/ties, BRT has paved road and buses, that are essentially no different from other buses which operate on the street, thus simplifying maintenance facilities, and employees needed.

LRT: LRT' advocates counter that these claims are a mirage. That in fact, Busways can be just as expensive as LRT if not more. They cite Pittsburgh's own West Busway as their main example. Which, like every other Port Authority project since the beginning of time has come in late and over budget. The cost of the project was $320 million for 5 miles of Busway, or roughly $40 million per mile. LRT advocates also claim that any cost savings in construction and lower overhead for maintenance are outweighed by the fact that the guideway for a BRT system has a MUCH shorter lifespan, along with the shorter lifespan of the buses vs. LRV's.

My Take: Edge BRT. There's a couple facts that should be taken into account. The West Busway was insanely expensive, and its cost per mile is much higher than what BRT advocates state the average cost per mile should be. However, that cost of $40 million is less than the average LRT. (Look at the NSC, if you DON'T count the tunnels, the construction cost per mile is approx $166 million*)


Which mode is More Cost Effective?

BRT: Advocates claims that BRT is more cost effective because the overall construction and maintenance costs are lower, and you get all the benefits of LRT. They even claim some advantages that LRT can not share, such as the ability of certain bus routes to operate at grade for portions of their route, and on the guideway for parts of ther route (for example, the Allegheny Valley Flyer which travels to East Liberty at grade, and then bypasses the bulk of Pittsburgh traffic by traveling the last 5 or so miles into Downtown on the Busway.)

LRT: LRT advocates claim that these benefits are overstated, and that BRT cannot provide the levels of service that LRT can. A study conducted by the city of Hamilton, Ontario found that in every city surveyed but one, operations and maintenance costs per rider were LESS for LRT vs. BRT.

My Take: Rest of the world, Edge LRT (Pittsburgh, Edge BRT). Why is that you say? There is a big caveat to this study; wanna know the only city whose cost per rider was higher for LRT than BRT? That's right, Pittsburgh. Across the board in Pittsburgh it costs more per passenger to run the T than it does to operate and maintain all three busways. The Hamilton report surmises that has to do with Pittsburgh's relatively low population vs. some of the other cities studied, such as Portland, San Diego, and Denver.

Which has the Propensity to Attract More Riders?

BRT: This is the one point the BRT advocates will readily wave the white flag on. They have recognized that the public prefers rail, whether it be a heavy metro or LRT. There are numerous studies on both websites to back this statement up. Even the BRT websites have not tried to directly challenge the assertions that BRT is less attractive to riders than LRT. Instead, they have undertaken studies on how to make BRT more attractive to those who prefer rail. (In short, their proposed answer is, make it as much like rail as possible).

LRT: Who's to argue with logic like that? When the BRT folks are conceding that they are not as attractive to riders, there's not much more to say.

My Take: Rest of the World: Edge LRT. Pittsburgh: Push. Once again, Pittsburgh bucks the trend. Pittsburgh's busways carry on average 17,000 more people per day than the T.

In most cases is LRT superior to BRT, in my unqualified opinion, yes. However, I think there is a tendency to dismiss BRT and I believe that notion to be a little bit short sighted. Clearly in the case of Pittsburgh, the Busway system has been very successful when you compare it to the T. Busways carry more riders and do it for less money.

Is a BRT a sure fire option over LRT? Of course not, but LRT is not always guaranteed to be a better option than BRT. In a place like Boston, BRT doesn't necessarily make sense, especially given the existing infrastructure and dense population. However, in a smaller population city like Pittsburgh, it's clear that BRT can fill a vital role. It can provide high quality, and rapid service by taking buses of the street and putting them on their own separated grade guideway, and do it more effectively than LRT. The point is, maybe urban planners need to look at both options, and don't just look at the biased opinions of special interest groups who clearly have an agenda beyond providing efficient transit service.

Tuesday, April 28, 2009

A Different Take on Inter-Connection

I've written before about the fragmented, and generally half-assed nature of Pittsburgh's transit "system". I also proposed my own design for a separated grade LRT system to help Pittsburgh have a more complete transit system. Now it's time for BRT to get its due. I've said before that I am pro-light rail, but honestly, from my perspective, whether I am riding a bus on the busway or an LRV on rails, I can still get downtown in about 5 minutes. That's what I care about.
The big difference between a true BRT and LRT is not whether the wheels are steel vs. rubber, or not what the wheels travel on; the big difference is in public perception, but that is another topic for another blog.

If we could have an interconnected LRT system, why not a BRT system? We already have busways that radiate in three different directions (East, West, and South) with just a few short miles between them, vs the single LRT corridor into the South Hills. The problem right now are those few short miles between them. With the current system, if the Port Authority were to create a bus that would go from Swissvale to Carnegie (basically the entire East/West Busways) the bus would have about a two mile stretch where it would have to contend with the streets of Downtown. The same goes for a bus that would travel the entire length of the East and South Busways. In my mind, running busway buses on regular streets to bridge the gap between busways is not an acceptable option.

What is a city to do? Simple, we create a link between them. I know what everyone's going to say, we can't afford that, or perhaps that it's just plain stupid. Luckily, my favorite two words make me think otherwise, existing infrastructure.

East Busway

Stay with me here, The East Busway would not end at Penn Station, it would continue, under the Post Office (on the Penn Park Branch of the T which is currently unused). The busway would travel THROUGH Steel Plaza where it would meet with the South Busway.

South Busway
The South Busway currently ends at Station Square. With my idea, it would continue to share rights of way with the T, all the way across the Panhandle Bridge, through the First Ave. station to Steel Plaza where it would meet with the East Busway.

West Busway
The West Busway is currently the most "isolated" of the three current Busways. It currently ends near Corliss St. Buses then travel via Carson St. to make their way downtown. This busway creates a challenge because it is the most "isolated" and there is really no good way to connect it with the other two busways. Luckily, we could get 7/8 of the way there.

The Wheeling and Lake Erie Railroad has a branch line that connects to their main line around the Wabash Tunnel and travels over the parkway where it meets the CSX mainline near the West End Circle. This track is unused, and has been for some time. This would be an excellent ROW for West Busway. It would parallel Saw Mill Run BLVD until the Wabash tunnel, where it would cross over Saw Mill Run BLVD on an abandoned railroad bridge, through the Wabash Tunnel to Carson St. Once at Carson St., the buses would take to the public roadway for a few hundred feet until it would meet up with the South Busway and the T at the Station Square stop.

Potential Issues

Why do I get the feeling this idea is going to go over like a fart in church? I can just see the comments now, about how it's unfeasible, and listing a million different reasons why it can't happen. Well, I racked my little brain is best as I could to address potential problems with the plan and here's what I came up with:

1. Emissions or exhaust inside tunnels and at Steel Plaza: There is an easy solution to this one. Hybrid buses, or even electric buses. Look, they're a good idea to have anyway for their environmental benefits, why not at least invest in them for busway service? Boston has a busway called the Silver Line that operates underground, but uses rubber tire electric buses on the route.

2. Operation of LRV's and buses on a shared right of way: This is not an issue because it already happens, buses and LRV's share the Mount Washington Transit tunnel with each other and they share right of way across route 51, before the South Busway splits off. Even with this idea, the two would not share right of way for more than a few miles. Even if speeds had to be limited to, say 15 mph, it's still a steady 15 mph, instead of slow, choppy movement through the streets of Downtown.

3. Clearance restrictions along shared rights of way: This obstacle would probably be the hardest to overcome. The first issue is that buses don't operate at high platforms, the T does. Platforms at Steel Plaza and 1st Avenue would have to be lowered, or at least parts of them would have to be lowered. The more problematic issue is buses bouncing off of high platforms and bridge abutments. I do know that an LRV is 105" wide where as the current Busway vehicles used by the Port Authority are 102" wide. This means an LRV vehicle is 4" wider than a bus, so clearance between vehicles traveling in opposite directions should not be a problem. That would also give buses some breathing room when operating near high platforms. However, I still don't know if I have a good answer for that dilemma. Perhaps some sort of guideway at stations could keep the buses in the right path (think the little track at the car wash that pulls your car through the car wash).

Operations

Given an inter-connected system of busways, the best way to operate it would be the the same way you would an LRT or any other rapid transit system. Use a color code, maybe a Red line from Carnegie to Swissvale, and have a Blue Line from the South Hills as far as downtown. At downtown, someone could transfer if they desired to do so.

This could be an excellent, inexpensive way to connect the closest thing Pittsburgh has to a rapid transit system. If feasible, this could be the perfect keystone to an expanded BRT system in Pittsburgh. If it's not feasible to connect the busways in this manner, hey, I'm just a history major who likes to blog about transit!