Showing posts with label Maglev. Show all posts
Showing posts with label Maglev. Show all posts

Friday, September 11, 2009

Keeping MAGLEV Inc. Afloat

In the latest victory to justify and allow their continued existance, a $28 million grant was awarded to MAGLEV, Inc. yesterday. Check out the article here in the Post Gazette.

My feelings on MAGLEV are pretty clear. I don't have a problem with the technology, and would love the idea of getting on a MAGLEV train and getting to Philadelphia in an hour or Chicago in a few. I just think this application as a commuter route to a nearly empty airport is absolutely ridiculous. All at a cost of $3.75 BILLION. By the way, that's in 2003 money. It's a safe bet that a more updated estimate would put the cost over $4 billion for 54 miles of MAGLEV track. Transportation in Pittsburgh already has enough black sheep, we don't need another. For the record the NSC at least allows Pittsburgh to expand its light rail network in the future to the north and west of the city. I don't envision a rapid transit system in Pittsburgh of interconnected MAGLEV lines.

I guess the bright side is that apparently this money was earmarked specifically for MAGLEV and does not come out of any sort of HSR funding.

While the MAGLEV funding wouldn't come out of a pot that Pittsburgh could use for transit, it's tempting to think about what you could get if you managed to get $3.75 billion for transit in Pittsburgh! Imagine the LRT or subway system you could have! Bottom line, there are so many better uses for the $28 million, let alone the $3.75 billion.

I feel like a broken record.

Friday, April 17, 2009

The Keystone Corridor

I'm pretty sure just about anyone who reads this blog is interested in transportation/transit topics and has probably already seen via the Post Gazette, Trib, or numerous other blogs that the Obama Administration has officially unveiled the plan for a National HSR (High Speed Rail) system.

Pennsylvania is in the running for funds to build a connection between Pittsburgh and Harrisburg which would complete a HSR corridor between Pittsburgh and Philadelphia.

A couple quick thoughts on my part:

-I want better Amtrak service than what we have now. The route over the Alleghenies (owned and operated by NS) is not the best route right now for HSR. It's heavily trafficked, and has many curves and steep grades. Couldn't we connect to Cleveland with HSR, and add more "standard" trains with better scheduling east to Harrisburg and beyond? I'm not saying don't throw money into upgrading the current route and adding trains. I'm saying significant upgrades could be made to the current route without making it an HSR route (at least for now). For the larger picture, this would free up more money for projects that are closer to reality (California for example) and still provide Pittsburgh area residents with an alternative to an expensive flight or a long drive.

-Having said all of that; I will gladly take any HSR funding that comes our way, and if I were given the opportunity to ride to Philadelphia on an HSR train, I would welcome it.

-Also, I think it's ridiculous to even mention the MAGLEV in the same sentence as this HSR plan as the Post Gazette has done. This plan is in no way shape or form supposed to give a Pittsburgh MAGLEV money, and I think to even entertain the thought is to invite trouble and slow down the process of doling out the money. I will say that a MAGLEV from Pittsburgh to Philadelphia would be incredible, and a great advancement. However, I say, take what you can get when you can get it. We are in the running for HSR funding, let's go for that instead. Not to mention, I can't imagine the ungodly price tag for such an animal.

Tuesday, March 17, 2009

The Maglev again??? Are you freakin' kidding me!!???

I was perusing the land of transit-hate known as The Pittsburgh Tribune-Review, and found a very interesting, and I have to say disturbing article about the Pittsburgh Maglev project. This project that somehow seems to cling to life is ready to receive another shot in the arm.

Before I bash this project (and I will), I will tell you that I am not against MAGLEV technology. It's potential to move people between cities cleanly and VERY quickly (in excess of 200MPH) is very attractive. I also think that the fact that the main proponent company named MAGLEV Inc. is local company in McKeepsort is great as well.

The only problem is, the Maglev is a TERRIBLE idea for a local rapid transit. It's incredibly expensive, and I think would be a better application over a long distance route (from Pittsburgh to Philly.)

According to an article in the Pittsburgh Business times from '07, the last cost estimate done for the project was done in 2003, and at that point it was over $3 Billion for the 54 mile proposed line. If we all know anything about transit cost estimates, is that they tend to run over, just a little bit. They run over even more during times when material costs are high. Just look at the NSC (North Shore Connector), three years ago it was supposed to cost $435 Million, barely 3 years later, the cost is now $552 million.

Imagine the inflation on $3 Billion over 6 years. That's assuming that they start tomorrow. Who knows the actual date that construction would begin. By that point, more years could elapse and more inflation could occur.

Price alone should not necessarily kill the project, but look at what you are getting for the cost. You are getting a single route from Greensburg to the airport, with stops in Monroeville, Downtown, and the airport. Just how many people would really need to take the trip to the airport these days? Flights are waaaaaaaaaayyyyyyyyyy down. The only real potential would be as a service to daily commuters from Greensburg, and perhaps from the airport (but I can't say how much of a market there really is for that) It could certainly attract riders in that capacity, but I don't know if that would outweigh the costs. The way the route is set up, I don't really see an additional value to it. Additionally, if it is only operating in this capacity, how much money is wasted by not operating during off-peak or off rush hour time periods?

There is enough transit half-assery in Pittsburgh already. You've got a number of incomplete and non-integrated( The T, and Busways that don't interconnect in any way) modes of transit already in place in Pittsburgh. We don't need a $3 Billion + addition to that list. Additionally, we've already spent a half a BILLION dollars to get across the Allegheny River. Do we really want to call that good enough? In my mind, and like I said in my post yesterday, one of the few silver linings about the NSC is at least it could be a spring board for expanding the T into the North Hills, or in the general direction of the airport. There is a limited chance that would take place if the NSC were the only major project, but there is a ZERO chance if the NSC was competing with a multi-billion dollar project in the Maglev.

I like the Maglev, its a great concept for intercity travel, but it's the wrong form of transportation at the wrong time in Pittsburgh.